
Concept / Unbuilt · 2026
MAISON SEREINE
Minimal Countryside Residential Concept
An imagined setting and unbuilt concept. No real parcel, property offer or development permission is represented.
Project statement
Maison Sereine explores a quieter scale of domestic space: a compact single-storey house gathered around a grassy courtyard. Its inward-facing plan offers shelter while low openings frame the surrounding countryside.
Smooth light-grey mineral walls, soft-white interiors and slim black frames define a restrained palette. Muted ash joinery adds warmth without decorative excess. One maple tree gives the courtyard a seasonal centre.
Three bedrooms, a work room and a separate media room sit alongside everyday living spaces. There is no pool; the garden, covered terrace and courtyard are the principal outdoor rooms.
Reading the project
A single level keeps everyday movement direct. The grassy courtyard draws rooms towards a protected outdoor centre, while the maple tree introduces seasonal change. Work and media spaces remain separate so the shared living room can stay quiet and uncluttered even when different activities happen at once.

Proposed palette / visual study
Material composition
A restrained set of surfaces connects the spaces throughout this concept. The image detail shows their intended relationship; finishes remain illustrative rather than product specifications.
- Light-grey render
- Pale-grey seamless flooring
- Muted ash
- Matte-black metal
- Soft-white plaster
Conceptual budget / 2026
- Estimated construction budget
- €1.1M–€1.7M
- Estimated total development cost
- €1.7M–€2.9M+
These are illustrative design-stage budget scenarios for fictional projects, not contractor quotes, valuations, researched market prices or offers for sale. Acquisition allowances are invented planning assumptions, not valuations of land or buildings. Actual costs may fall outside these ranges.
Budget assumptions
| Allowance | Concept range |
|---|---|
| Construction & fit-out | €1.1M–€1.7M |
| Illustrative site acquisition allowance | €0.2M–€0.5M |
| Fees, taxes, enabling works & contingency allowance | €0.4M–€0.7M |
Acquisition and the listed allowances are included in the total scenario. Financing is excluded. Planning requirements, professional fees, engineering, permits, taxes, infrastructure and site-specific conditions may materially change the result; these allowances have not been independently assessed.















Concept plans
Spatial studies / not to scaleRoom relationships, circulation and outdoor spaces. Drawings and images explore the same brief; they are illustrative studies and are not technically coordinated construction documents.
Project details
MAISON SEREINEGround floor — 240 m²
| Space | Program area |
|---|---|
| Entrance | 10 m² |
| Living room | 34 m² |
| Kitchen and dining | 36 m² |
| Primary bedroom | 22 m² |
| Primary bathroom | 10 m² |
| Dressing room | 8 m² |
| Guest bedroom 01 | 16 m² |
| Guest bedroom 02 | 16 m² |
| Guest bathroom | 8 m² |
| Study | 14 m² |
| Media room | 20 m² |
| Utility and plant | 12 m² |
| Powder room | 4 m² |
| Circulation and storage | 30 m² |
| Total | 240 m² |
Material and spatial language
- Smooth light-grey mineral render, soft-white plaster and pale-grey seamless flooring.
- Slim matte-black aluminium frames and fixtures; muted ash built-in joinery.
- A 40 m² open grassy courtyard with one maple, a 35 m² sheltered terrace and simple meadow planting. No pool or bronze details.
Area basis
- Areas are room-program targets including the listed circulation and service spaces. They are not measured floor areas or survey quantities. External walls and structural thicknesses are not included in the room schedule.
- Outdoor spaces are separate from the internal program. Plans indicate relationships and access; geometry and building systems are not construction coordinated.
Climate and technology
- High-performance glazing, external shading and insulated solid service cores form the environmental concept.
- Concealed zoned heat-pump cooling, radiant floor heating and mechanical ventilation with heat recovery are proposed; capacity and performance have not been engineered.
- Integrated television, audio, lighting controls, security and motorized shading remain part of the minimal interior. Door sensors reduce cooling output when large openings are open.
- Plant, ducts and maintenance access require coordinated professional design. Passive ventilation is used only when outdoor conditions permit.
Concept status & limitations
All images, plans, dimensions, materials, costs and architectural details are illustrative conceptual studies and may be AI-assisted. These are unbuilt projects, not real properties offered for sale.
Not intended for construction, permitting, structural design, engineering, code compliance, valuation or professional architectural services. A real project would require appropriately qualified architects, engineers, consultants, contractors and local authorities.
All disclaimers